WHY A NEW EARTH POWER ROUTE
POWER EXISTS.
THE ROUTE DOES NOT.
The best places to generate power are often far from the cities, factories, and data centers that need it most. New generation cannot serve demand if grid interconnection and transmission construction cannot keep pace.
2,061 GWPOWER WAITING FOR CONNECTION
Generation and storage capacity waiting in U.S. interconnection queues at the end of 2025. Not all of it is expected to be built.
>5 YEARSREQUEST TO OPERATION
For projects that began operating in 2025, the median time from interconnection request to commercial operation exceeded five years.
13%CAPACITY REACHING OPERATION
Share of capacity that entered U.S. interconnection queues from 2000–2020 and had reached commercial operation by the end of 2025.
OUR RESPONSE / INITIAL DEPLOYMENT TARGET / NOT YET DEMONSTRATEDWherever the required land, equipment, safety measures, and permits are secured, our wireless power system targets same-day energization.
FIRST DEMONSTRATION / MARITIME
START AT SEA.
SCALE BEYOND.
Electric ferries and cargo ships are already in service. Longer voyages demand more battery mass and space. We will start with laser power delivery to electric ships, aiming to extend range while preserving room for cargo.
01SEAWATER COOLING
Use the surrounding sea as a heat sink for the receiver through a separate cooling circuit.
02ROOM FOR RECEIVERS
Larger vessels offer space for bigger receivers and cooling equipment, easing the mass and packaging constraints of flight.
03A MOVING TEST PLATFORM
Bring tracking, power conversion, and onboard supply together at sea, then carry that work into aircraft and ground applications.